StyroStone Supply scandal

StyroStone® supply scandal

StyroStone® supply scandal

Potential self builders aiming to construct their new dream homes should be made aware of a clever play on words being used by some unscrupulous ICF contractors.

ICF's (Insulated Concrete Forms) also known as PIF's (Permanent Insulated Formwork) have been known generically as styrostones. Building blocks constructed from styrofoam. However as the popularity of this modern method of construction soars so do the inevitable availability of imitations grow.

There are a number of excellent reputable products on the market each with their own merits and also downsides. The original styrostone system was produced in 1950 and named the Iglu-system.
Since then many ICF's have emerged.

StyroStone® are one of the oldest and highly respected companies in the ICF business. Their system has been imitated world wide and variations to the design have enabled any breach of copyright. The family run company are sadly victims of its own success. Nowadays when a prospective client enquires to a construction contractor or ICF supplier “do you build with/ supply styrostone they inevitably reply YES. Of course they are being truthful to a degree, they will build with styrostones -stones made from Styrofoam.
They are not however using the official STYROSTONE® brand. The client may think they are “getting a deal” by not buying off the official web site. Beware! they could be using an inferior product and the client does not know any different. The risks are that the substitute product does not have any accredited certification. The insulation values could be lower or the density of styrofoam much lower than the real thing. The pitfalls are that mortgage companies will not lend on uncertified systems. If the thermal insulation values are not adequate – energy bills will be higher. If the block density is low there is a risk of blow outs during the concrete pour.

HOW CAN YOU TELL??

In Wales we have a renowned delicacy known as the Clark's Pie http://en.wikipedia.org/wiki/Clark%27s_Pies. It is a pie to die for!
There is an art to eating one of these gems, acquired only after years of practise. Once mastered you would never eat anything but the original Clarke's Pie. Many bakers have tried to copy this delicacy they fail miserably. How do you know you are buying the real thing- it is embossed into the base pastry of the pie “CLARPIE”.
How do you know if you are in fact getting the real deal and buying Styrostone ® ?
Quite simply the real Styrostone® has the logo embedded into the walls of every stone. Each pack of blocks comes on a pallet marked with the StyroStone ® logo.

Do not settle for anything less than real Styrostone's, Like the original pie ,they just won't rest easy on the pallet.

Please be aware that CleanFootprint  Ltd only use the original StyroStone ® products.

Published in Clean Footprint
Monday, 21 January 2013 20:44

Retro Fit and Replicate

A project briefing

Project Background
After spending the last 5years living in an eco friendly energy efficient StyroStone property in Spain we moved back into our old property in the UK.
This house was built in a traditional manner out of block work and stone by myself to a high standard, however it was constructed in line with current building reg. Standards (for 1998). After the first month we were alarmed that we had ran out of fuel for our heating for the second time.

At first we thought that there had been a leak in the service pipe or that we had been subject to an act of fuel theft. Only after closely monitoring our fuel use did we realise it was due to the fact that fuel cost had risen so dramatically, that what we had spent, that had previously been sufficient to see us through the winter was now only lasting a few weeks. We decided to commence on a programme of retrofitting internal insulation and other measures to reduce our bills.

Project BackgroundAt the same time my son had purchased a terraced property in the same town which was in need of total renovation. We decided to apply all of the principles of a StyroStone construction to the renovation of this property as well, and thus take the property from a "G" rating to a respectable "B" rating, hence reducing Carbon emissions and energy bills by up to 80%.

Our train of thought was to do as much as possible on a £20,000 budget so that this could be tagged onto the mortgage for a minimum monthly repayment, compared to doing minor upgrades and having to suffer ever increasing energy bills whilst living in this property. This way my son would know what his fixed expenses were and would always have more disposable income on a week in week out basis.

THE EXISTING PROPERTY

42 Pill Street, Cogan, Penarth was built approx 110yrs ago of solid wall construction. It had since been upgraded by having the front elevation rebuilt in cavity work with 25mm foam insulation. This also applied to the rear annex. The property had originally been a 3 bed, 2 reception no bathroom house however the rear bedroom had been converted to a bathroom.
Gas fires were installed in a poorly constructed rear ground floor kitchen extension, with flat roof, and in the lounge.
The front room floor had been renewed in concrete and screed however the middle room still boasted a suspended timber floor. The wiring was in poor condition. The Existing PropertyThe roof space on the extension and the main building were uninsulated.

The plan was to reduce the size of the bathroom on the first floor and introduce a shower alongside the bath. Make room for a boiler and thermal store and to convert the loft space for use as an additional store space/office area.
Although building regs/planning were not required or applied for, we were to construct everything in accordance with and where ever feasible supersede building reg requirements. This way, should any future occupier wish to use the roof space as a third bedroom, permission could be applied for and approved without problem.

RETROFIT PROPOSALS
As previously stated our main drivers for retrofitting the property were to reduce fuel bills and carbon emissions by up to 80% and enable my son to live in comfort without paying on an escalating curve.
The priorities were to make the property air tight, super insulate the walls and roof and fit suitable heating systems for space and hot water. This would be via a gas condensing boiler and solar panel. If the budget permitted, we would fit MHRV, however it may, at this stage, be only affordable to pre fit the ducting for this system and add the main unit at a later date.

It was necessary to rewire the property and fit new kitchen and bathroom. The kitchen would be eco friendly and contain "A" rated appliances.
We would also insulate the floors where possible.
Petrofit ProposalsResearch proved that Kingspan K17 phenolic foam backed plaster board were the best option to line the external walls of the property to give the best U value. These boards are a total of 92.5mm thick however due to the size of the rooms, once fitted the loss in space is not noticeable.

Celotex 75mm was used between the roof rafters in conjunction with Web Dynamics TLX silver multifoil for the insulation of the loft space. This would assist in our goal of air tightness. One of the natural by products of building with StyroStone permanent Insulated Formwork, is that being a mono coque structure, it is inevitably air tight.

The work force on this retrofit project were given tool box talks on the how's and why's of making a building air tight. Explanations on how this can be checked and monitored using infra red and thermal imaging, ensured that guidelines were adhered to. Once the team is on board and understand the dynamics, the rest is easy!

By far the simplest and most effective measures that can be taken to reduce fuel bills is to fit insulation to the fabric of the house and make it air tight. The house then performs just like a Thermos flask, it will maintain whatever temperature you have inside it as long as there is no leaks or escape paths for the energy to leave.
If the heat does not escape you do not need to keep burning fuel to replace it , and if you are not burning fuel you are reducing your carbon footprint and saving money at the same time. A true win win situation!.

If you were sat in a room and £5 note blew out of an open window, you would get up and chase it down the road, and yet this in reality, is what we ignore every day that we live in a draughty poorly insulated house! Money escaping through the walls and roof.
Why go to building regs which only suggest the minimum? Why wait for them to change?
Go for the best insulation now and start to save money.
In this economic climate it is a better investment than an ISA.

View Gallery

Published in Clean Footprint
Monday, 21 January 2013 20:33

Retro Fit Case Studies

Retro Fit Case Studies

 

Retrofit & replicateRetrofit & replicate
After spending the last 5years living in an eco friendly energy efficient StyroStone property in Spain we moved back into our old property in the UK.
Read More...
View Gallery

Pembroke terrace case studyPembroke terrace case study
This project involved the complete renovation of a Victorian end of Terrace to modern standards.
Read More...
View Gallery

Pultney Garden case studyThe Bath Project
The project in 16 Pultney Gardens, Bath, is particularly significant due to the fact that Bath is aiming to become the retrofit Capitol of the UK .
Read More...
View Gallery

Published in Clean Footprint
Monday, 21 January 2013 20:22

Projects

Projects

 

On Site Training... Experience The Build!On Site Training... Experience The Build!
A recent self build in S.Wales where the client, a complete novice to construction, had the team carry out the ground works and build the shell and then he completed the project using sub contract teams.
View Gallery



Freshwater East - Styrstone project of new build holiday homeFreshwater East - Styrstone project of new build holiday home
This project was to demolish an existing building that contained a high volume of asbestos and to dispose of the same .We were then tasked with all aspects of the structure from below ground to roof including raft foundation ,retaining walls tanking etc.
View Gallery



Extension to match existing build finishExtension to match existing build finish
These photos depict the stages of a recent build for client V. Jones, where a variety of finishes were employed to terminate the exterior of the Styro Stone shell.
View Gallery

 

Swanbridge FarmSwanbridge Farm
Traditional Build 1997
View Gallery

Published in Clean Footprint
Monday, 21 January 2013 18:03

Services

Services

Cleanfootprint tailor their services to suit the client requirements. We have a dedicated team to provide service to all aspects of the build process including architects drawings, structural calculations, design, and build packages.

Simply Contact us and tell us what you want, we do the rest!

Ground work

 

Ground work
Clean Footprint Ltd provide a bespoke service from site clearance, reduce level dig, ground preparation, foundation construction to FFL ready for super structure to commence.

 
Structure only

 

Structure only
Some clients will have the desire and the ability to manage the project however do not have the time or resource to construct the shell of the build. Simply have the shell built by us ,then manage the follow on trades.

 

Turn key


Turn key
Tell us your idea for the project and we do the rest, from plans to completion.

 

 

Land scaping


Land scaping
The project is finished, put the icing on the cake by having it professionally landscaped.

 


Building Abroad?

Building Abroad?
The team at Clean footprint ltd have significant experience of carrying out build projects in Spain and France and are familiar with the formalities of building in these countries. If you have desires of building in your dream destination, however want to use a team you can communicate with effectively, Contact us for more information at .


Published in Clean Footprint
Monday, 21 January 2013 16:48

ICF Contractors

ICF Contractors

 

StyroStone
Elements of the StyroStone product range

The team at Clean Footprint is made up of a nucleus of highly experienced construction contractors ranging from groundworks specialists to formwork ,civil engineering and specialist house builders.

The team have all worked together on various projects over a period spanning 20yrs.

All have the common goal of providing a superior standard of quality in their product and ensuring that the construction period is reduced to a minimum without compromise.

As ICF Contractors we aim to provide a service tailored to individual project requirements whilst respecting environmental issues.

Clean Footprint promotes the use of StyroStone insulating forms for its structural wall elements.

Having researched the market for 10yrs we find that although most ICF providers are of high quality, StyroStone have the edge with their broad spectrum of blocks providing the requisite u value to suit individual projects and their “complete system” eliminating the need for additional timber shuttering around windows , door openings etc.

Contact us at for more information.

Published in Clean Footprint